Latest News

JHGS Construction Update 63
September 2018 Construction Update Released
JHGS Construction Update 62
August 2018 Construction update released.
JHGS Construction Update 61
July 2018 Construction update released.
JHGS Construction Update 60
June 2018 Construction update released.
Road Closure Aug 2nd
As a follow up to the previous road closure notice, Brewster Lake Road across John Hart dam will be closed August 2, from 8:30 am to 5 pm.
Road Closure-July 23
The road across the John Hart dam will be closed from 8:00 am to 5:00 pm on July 23, a second day of closure will take place sometime between July 27 and 31.

Upcoming Events

No items available.

Latest Notices

JHGS - Temp Closure
Temporary closure for new trail as hydro construction begins
JHGS - River Flow Update
The weather conditions have not changed over the past month and therefore the low water inflow conditions continue for the Campbell River system. From October 7 to date, the water inflows into the upstream reservoirs are now the second lowest in 50 years of record.
Reduced River Flow
As a result of the ongoing dry fall season BC Hydro reduced the discharge from the John Hart generating station from about 82 cubic metres per second (m3/s) to about 67 m3/s.
JHGS Business Open House
Local businesses will have the opportunity to meet representatives from short-listed bidders for the John Hart project.
High Water Alert
BC Hydro will be conducting river flow tests on June 21st and 23rd, 2011.